Building Inspections - What You Need to Know
Once your Building Consent is issued by Council, a list of required inspections will be included in your building consent documentation. You need to book these inspections as each stage of work is completed. A minimum of 24 hours notice is required, booking no later than 3.00pm the previous working day. Inspections will then be allocated on an “as available” basis.
Inspections are a means of being satisfied with compliance with the Building Consent conditions and the Building Code. They are not intended to replace advice from your designer or trades people.
Information You Need When Booking an Inspection
When you make your booking, you will need to supply the following information:
- The name and contact phone number of the person who will be on-site at the time of the inspection
- Your building consent number
- The site location / address
- The type of inspection required
- Date of inspection and morning or afternoon.
All building consent documents and any approved amendments must be on-site at the time of inspection.
Booking and Availability of Inspections
The Tasman District area is divided up to manage inspections. Area contact details and times for booking inspections are shown below:
- phone 03 543 8552 for Richmond - Inspections are available Monday to Friday 8.00am- 4.30pm
- phone 0800 543 852 for Motueka - Inspections are available Monday to Friday 8.00am- 4.30pm
- phone 0800 543 852 for Golden Bay - Inspections are available Monday to Friday 10.15- 4.30pm
- phone 0800 543 852 for Murchison Lakes - Inspections are available Tuesday and Thursday 9.00am- 3.30pm.
Inspection Types
- Siting/foundation block wall
- Foundation/Piles
- Concrete slab
- Timber sub floor
- Truss/roof/pre wrap
- Pre line brace/insulation/plumbing
- Post wrap/cavity
- Pre-butynol/deck membrane
- Brick veneer mid wall height
- Masonry block construction infill/cleanouts
- Masonry block construction bond beam
- Retaining wall drainage
- Wet area membrane
- Drainage sewer/storm water
- On-site effluent
- Stucco/texture pre coat
- Stucco control joints
- Weather tightness
- Solar heating
- Metal exterior cladding
- Swimming pools fence
- Exterior drained land service
- Heating unit installation –inbuilt cavity
- Fire inbuilt fire final
- Fire free standing fire final
- Interior /exterior final Inspection CCC