Resource Management: Administration Monitoring & Supervision Charges of Resource Consents
|
1 July 2011 to 30 June 2012 GST inc 15% |
|
| Gravel/Shingle Extraction Fees | |
|
Waimea/Wairoa Rivers Wai-iti Upper Motueka (including all tributaries above Baton Bridge) Lower Motueka (including all tributaries below Baton Bridge) Moutere Riwaka/Marahau/Sandy Bay Takaka and Tributaries Aorere and Tributaries and other Golden Bay Rivers Buller Other Rivers, Streams and Coastal Marine Area Gravel extraction outside of the above-listed areas on freehold land within the river berm area inundated by an annual flood Sand in Lower Motueka River (including all tributaries below Baton Bridge)
Gravel extraction on freehold land outside of the river berm area inundated by an annual flood
|
$5.40/m3 $5.40/m3 $5.40/m3 $5.40/m3 $5.40/m3 $5.40/m3 $5.40/m3 $3.90/m3 $2.80/m3 $3.90/m3 $2.15/m3
$2.15/m³
Actual and reasonable monitoring charges at $134.00/hr |
| Coastal Structures - Annual Charges | |
|
Coastal Structures per consent: Aquaculture Activity 0-10 lines each additional line other structures (excluding structures that extend landward of MHWS) |
$445.00 $28.00 $95.00 |
| Water Permit Annual Charges | |
| For stock water, private domestic use, fire fighting, cooling, private community water supplies, recreational uses, seawater takes and permits to take water to or from an irrigation dam, reservoir, pond, seepage hole or embayment irrespective of the quantity authorised. | $125.00 |
|
For all other permits to take water, the fee is based on the daily quantity of water authorised as set out below: Less than 250 m³/day 250 - 499 m³/day 500 - 999 m³/day 1,000 - 2,499 m³/day 2,500 - 4,999 m³/day 5,000 - 14,999 m³/day 15,000 - 49,999 m³/day 50,000 -299,999 m³/day 300,000 m³/day or more |
$175.00 $246.00 $345.00 $465.00 $760.00 $1,305.00 $2,850.00 $8,550.00 $23,295.00 |
| A discount of 33% shall apply to permits in the Upper Buller and Aorere West Coast Water Management Zones for the above water permit annual charges. | |
| Waimea Water Augmentation Feasibility Study - An additional monitoring surcharge for permit holders in the Delta, Waimea West, Golden Hills, Lower Confined, Reservoir, Hope and Upper Confined Water Management Zones will be as follows: |
Surcharge |
|
Less than 250 m³/day 250 - 499 m³/day 500 - 999 m³/day 1,000 - 2,499 m³/day 2,500 - 4,999 m³/day 5,000 - 14,999 m³/day 15,000 - 49,999 m³/day 50,000 m³/day or more |
$192.50 $223.50 $327.50 $515.00 $940.00 $1,575.50 $3,457.00 $9,969.00 |
| Water Meter Levy on consented takes where meter is required to be installed | $95.00/meter |
| For Permits to Dam Water | $45.00 |
| Discharge Permits (Water or Contaminant) Annual Charges | |
| Permits to discharge scour water from dams and pipelines, for water resource augmentation, spillway and compensation flows, minor cooling water dicharges, minor spraying operations and flood/drainage discharges and stormwater related to commercial and industrial activities. | $95.00 |
| Dairy shed and piggery discharges (including laboratory costs). | $345.00 |
|
Fish Farming Less than 1,000 m³/day authorised discharge 1,000 - 4,999 m³/day 5,000 - 14,999 m³/day 15,000 - 49,999 m³/day 50,000 - 99,999 m³/day 100,000 m³/day or more |
$95.00 $235.00 $645.00 $1,320.00 $3,300.00 $4,350.00 |
| Food Processing Industries (including by way of example, abbatoirs, fish processing, vegetable processing, dairy factories, wineries) | |
|
Untreated waste to water Authorised at less than 200 m³/day 200 - 999 m³/day 1,000 m³/day or more |
$665.00 $1,915.00 $3,790.00 |
|
Semi-treated/screened waste to water Authorised at less than 200 m³/day 200 - 999 m³/day 1,000 m³/day or more |
$315.00 $950.00 $1,915.00 |
|
Fully treated/unpolluted waste to water or discharge Authorised at less than 200 m³/day 200 - 999 m³/day 1,000 m³/day or more |
$95.00 $195.00 $390.00 |
|
Gravel Wash and Mining Discharges Less than 1,000 m³/day authorised 1,000 - 2,999 m³/day 3,000 m³/day or more |
$235.00 $390.00 $650.00 |
| Sawmills, Timber Processing Discharges | $235.00 |
|
Power Generation Discharges Less than 1,000 m³/day authorised 1,000 - 4,999 m³/day 5,000 - 24,999 m³/day 25,000 - 299,999 m³/day 300,000 m³/day or more |
$95.00 $235.00 $480.00 $690.00 $4,405.00 |
|
Sewage Effluents: Residential dwellings with septic tank systems on single title are exempt |
|
|
Less than 50 m³/day authorised 50 - 99 m³/day 100 - 999 m³/day 1,000 - 9,999 m³/day 10,000 m³/day or more |
Primary treated septic tanks $350.00 $653.00 $1,340.00 $3,170.00 $5,480.00 |
|
Less than 50 m³/day authorised 50 - 99 m³/day 100 - 999 m³/day 1,000 - 9,999 m³/day 10,000 m³/day or more |
Secondary treated oxidation ponds $340.00 $520.00 $930.00 $1,325.00 $2,205.00 |
|
Less than 50 m³/day authorised 50 - 99 m³/day 100 - 999 m³/day 1,000 - 9,999 m³/day 10,000 m³/day or more |
Tertiary treated/land disposal $300.00 $435.00 $490.00 $665.00 $1,050.00 |
| Tip Leachate, Contaminated run-off, Emergency wastewater or Industrial discharge | $465.00 |
| Discharges to land under Section 15(1)(d) | $95.00 |
|
Discharge Permits (Air) Annual Charges Major air discharges (former Pt A [Clean Air Act] activites) Minor air discharges (former Pt B [Clean Air Act] activities) Minor air discharges (former Pt C [Clean Air Act] activities) |
$3,525.00 $655.00 $195.00 |
General Rules Applying in Respect of Charges