Riwaka-Kaiteriteri Road Curve Realignment

This page provides details about a project to improve the alignment of some corners on the road between Riwaka and Kaiteriteri Beach.

About the Project

We're working to improve the safety of this main tourist route between Riwaka and Kaiteriteri.

There are several corners that may need re-shaping and realignment.

The first corner to be worked on is a section of road approximately 200m long between Stephens Bay and the Kaiteriteri beach.

Back to Top


Detailed design is due to be completed by the end of March 2018.

Following that, construction of the first section should begin in May and end in July 2018.

Back to Top


As at February 2018, the project is in detailed design.

Back to Top

More Information

For more information email or contact the Project Manager, Graham Rimmer, on 03 543 8631.