This page contains plans and projects for the Tasman Village Settlement outlined in Council's Long Term Plan and Annual Plan.
The Draft Long Term Plan 2012-2022 is currently being considered. Updated information will be posted following its adoption in June.
- View the Tasman District Council Draft Long Term Plan 2012-2022
- Tasman - Settlement - Growth Model Map
- Tasman Settlement - Infrastructure Map
Important Note About the Draft Annual Plan 2011/2012
The Tasman District Council Draft Annual Plan 2011/2012 was adopted by the Council on 10 March 2011. This contains proposed changes from the 2009-2019 Ten Year Plan and the final list of projects will be confirmed by the end of June 2011following consultation with the public.
Tasman Village Settlement Profile
Tasman Village is a small rural service centre surrounded by land of high productive value much of which is zoned Rural 3.
The main issue for Tasman Village is that the lower part of the settlement is located on poorly drained clay loam which causes severe drainage difficulties, for effluent and stormwater disposal. This limits infill development. Some existing land has been unable to be fully utilised because of these poor effluent disposal conditions.
A TRMP Plan change to permit smaller allotment sizes could be considered if and when a reticulated sewage scheme is available. (Such a scheme is not provided in the Ten Year Plan.) Containment of urban development enables the continued use of the surrounding productive and versatile land. For traffic safety reasons, it is desirable that urban development at Tasman Village is contained on the west side of the main highway.
Tasman Village Population Growth
Estimates from Statistics New Zealand project the Tasman Village population growing from 166 in 2006 to 192 in 2031. This represents an annual average growth rate of 0.59%
Tasman Village Settlement Area and Engineering Maps
The following PDF maps show the settlement area and planned engineering maps in relation to the 2009-2019 Ten Year Plan.
Tasman Village Zoning
Future business and residential demand is expected to be satisfied through infill within existing residential and commercial areas. Any development is required to be self servicing. Refer to the Tasman Village Settlement Area Map: Tasman Village Settlement Area Map
Major Projects Planned for Tasman Village - 2009-2019
These projects are part of the 2009-2019 Ten Year Plan.
Engineering
Refer to the Tasman Village Engineering Map
- Stormwater upgrade 2011/12
Indicative Major Projects for Tasman Village - 2019-2029
These projects have been identified in the long term plan process past 2019.
Engineering
- Awa Awa Road reconstruction – completion of seal widening for 1.4km
Community Services
- Ongoing development of walkways and cycleways throughout the District.
- Ongoing management, maintenance, planting and development of existing reserves and facilities.
- Purchase and development of new reserves and facilities to meet the needs of the District’s growing population.